Beijing Gaobeidian Wastewater Treatment Plant
Time:
2021-09-15
Typical case of harmonic treatment in sewage treatment plant (Beijing Gaobeidian Wastewater Treatment Plant) Background of the project: The load of a substation of a sewage treatment plant is mainly composed of 21 frequency converters, and the corresponding motor is driven by the frequency converter. The power distribution is 7 sets of 37kW, 7 sets of 2.2kW, and 7 sets of 1.5kW. Each of them is a group of 7 groups, each of which is one 37kW, one 2.2kW, one 1.5kW, and the system is put into three groups at the same time. Since all are inverter loads, the inverter is a very large harmonic source, which brings serious harmonic pollution and harmonic interference to the system, causing the system to not work properly, and often burns out electrical components, in order to To solve the problem, harmonic management must be carried out.

Related Cases
Follow Us

Guangdong Guangda Electric Co. Ltd.
Tel:18028173868
E-mail:gdgddq@126.com
Web:www.gd96.com
Add:Shiyou Industrial City, No. 6, Cangsha West Road, Jun'an Community Residents Committee, Jun'an Town, Shunde District, Foshan City, Guangdong Province